Screen the well. Size the lift. Get it priced.
Six lift methods ranked against your well, the winner sized, and a request for quotation built from the result.


No manufacturer stands behind the ranking.
Every method is scored by the same rules against the same well, and the reason for each score is printed beside it. The answer has nothing to sell you.

Four calculations for one well.
Take the one you were asked for. Each ends in a specification a supplier can price.
Artificial lift
how the fluid comes upSix lift methods ranked against the well, the winner sized, its ten-year cost of ownership, and a specification a supplier can quote against.
Open
Stimulation
treat the damage, or fractureWhat the near-wellbore damage is costing, which treatment route the rock allows, and what removing the skin would be worth.
OpenSidetrack
what a lateral would be worthThe productivity of a lateral drilled out of this hole against the vertical it replaces, by length, with the cost beside it.
OpenImproved recovery
what the reservoir will takeScreen a reservoir against the improved-recovery criteria, method by method, with the reason for every verdict.
OpenAnd then, who can supply it.
Who supplies each category of equipment in this region, and the request a supplier receives.

From the well to the request.
Load the well
Pick a play from the library, type the well in, or drop a production export. The file is read in your browser.
Read the answer
A ranking with the reason for every score, the winning method sized, and its cost of ownership over the evaluation period.
Send the request
Download the request for quotation as a PDF and tick the suppliers for each item on the bill of materials.

What the supplier receives.
A request for quotation built from the screening, ready to attach to an email.
- Well conditions
- Every input with its SPE symbol, its value and its basis: supplied, derived or a default.
- Scope of supply
- The equipment the winning method needs, sized and counted for this well.
- Specifications
- The standards each item is built to, and what the supplier must state against them.
- Commercial terms
- Installed price, lead time and warranted run life, weighed on cost of ownership rather than purchase price.
The request names no other recipient, so one file goes to every supplier you tick.
Your file stays on your machine.
A production export is read in your browser and is never uploaded. A calculation is kept only when you save it to your cabinet.
Run your first well.
The calculator opens on a play from the library. No account, no installation.